Sell Fire Damaged HouseAustin

HomeHow it works

How This Works, Step by Step

An Austin fire file resolves into four decisions taken in a particular order. Taken out of order, or with the first two skipped, owners routinely accept numbers built on the smaller of two possibilities.

Start HereFour quick taps, about a minute
  1. Address
  2. Damage
  3. The Lot
  4. Contact

Four quick taps. No obligation, no repairs and no fee to you.

We never sell or share your details. Privacy policy.

Decision One
How many dwellingsLot size and zoning
Decision Two
How big may one beMapped boundary
Decision Three
Repair or replaceWhat survived
Decision Four
Do it or sell itYours alone

Decision One: How Many Dwellings Will the Land Carry

This comes first because everything downstream depends on it, and because it is the one owners most often never ask.

Two and three unit projects require at least 5,750 square feet in SF-1, SF-2 or SF-3. The small lot use permits a single unit on as little as 1,800 square feet. The appraisal district's parcel record gives both the dimensions and the zoning at no cost.

If the answer is three, a category of buyer exists for your property that does not exist otherwise, and they are frequently the highest bidder. The full position is on our page covering what the lot can hold now.

What If I Do Not Want Three Units on My Land?

Then do not build them. The entitlement still raises what a buyer will pay for the property, so knowing it exists is worth money even to an owner who intends to sell and walk away. It is information about your asset rather than a plan you are agreeing to.

Decision Two: How Big May a Single Dwelling Be

Only relevant if the answer to decision one is one dwelling, or if you want a house regardless.

Inside the mapped Subchapter F boundary a single dwelling is capped at the greater of a 0.4 floor to area ratio or 2,300 square feet, and the side and rear setback planes rise fifteen feet before sloping inward at forty-five degrees. Outside the boundary neither applies and the base zoning governs.

Why Are These Two Separate Questions?

Because the ordinances have different geographies. HOME applies by zoning district across the city; Subchapter F applies within a mapped central boundary. A property can easily fall under one and not the other, and assuming one answer settles the other is the commonest mistake we see here.

Decision Three: Is There Anything Worth Keeping

Now, and not before, the building matters.

The questions are whether the framing came through, whether the era means dimensional lumber that repairs in sections or engineered assemblies that come out whole, and whether a brick skin is structural or veneer over frame. On veneer there is no shell to preserve once fire reaches the framing behind it.

And the slab. Almost all housing here sits on slab-on-grade and heat damage to a slab does not show. It is the largest unknown on most files and the thing buyers discount hardest for.

Is an Engineer's Assessment Always Worth It?

Not always here, which is unusual. Where decision one produced a clear three-unit answer on a strong lot, a buyer is pricing demolition rather than repair and the report buys information nobody will use. Everywhere else it converts the largest unknown into a documented number and pays for itself.

Decision Four: Yours Alone

With the first three settled you have what you need: how many dwellings, how large, and what stands. Everything after that is preference and appetite.

Repair keeps the margin where the work sits below finished value. Rebuilding one house is straightforward. Developing two or three units is worth more on a qualifying lot and is a genuinely different undertaking. Selling hands all of it to somebody else.

What a Written Figure Contains

Finished value of what can be built there, the cost of getting to it, carrying cost and margin, each on its own line. Texas charges no transfer tax, so nothing comes off as a percentage of the price.

Where the arithmetic favours you doing it yourself, the email says so and explains which of the four routes it favours.

What Never Happens

No fee at any stage. No request that you clear the site, board it, commission a report or repair anything first. No requirement that your claim be settled. No assignment of the contract to a third party.

Common Questions About the Process

How Long Does It Take?

Address to written figure is usually a few days, most of which is the first two decisions. Closing depends on title, and the insurance claim does not have to be resolved first.

Do I Need to Be in Texas?

No. Out-of-state owners are common on inherited property and remote closing is routine.

Can I Compare You Against Others?

Please do. The questions on our page about how to tell local cash buyers apart apply to us the same as to anyone.

Start With the Address

We will work through all four and tell you what each one says. Nothing is owed and nothing is committed.

Get a Number on the PropertyStep 1 of 2 — where is the property?
  1. Address
  2. Damage
  3. The Lot
  4. Contact

Four quick taps. No obligation, no repairs and no fee to you.

We never sell or share your details. Privacy policy.

Get a Cash Offer